Skip to main content
Mayor of London logo London Assembly logo
Home

Search questions

Filter results

Asked of 2

  • Operation Terminus

    • Reference: 2012/0052-2
    • Question by: Len Duvall OBE
    • Meeting date: 25 October 2012
    Operation Terminus, I think if we can begin with MOPAC, I think you have had representations, the Refugee and Migrant Forum of East London has written to the Mayor around those issues. Do we happen to know what the Mayor's response to the letter from this group is?
  • Targets (Supplementary) [1]

    • Question by: Len Duvall OBE
    • Meeting date: 25 October 2012
    The last MOPAC Challenge in October identified the issues around a very rapid increase in volume of theft from the person in the boroughs. Given the period of time, and it was an annual comparison with the previous year, there has been an explanation, but have you had a chance to drill deeper into why this has occurred in that period of time?
  • Undercover Officers (Supplementary) [1]

    • Question by: Len Duvall OBE
    • Meeting date: 25 October 2012
    Very quickly, on the compensation issue of any compensation paid, look, you are making massive cuts to our services here in London. I hope that you are going to recover any monies that have to be paid, if they are paid eventually, from the owner of this or from the Association of Chief Police Officers Terrorism and Allied Matters (ACPO TAM) who were meant to be supervising these officers. I do not think the MPS should be paying for that and I hope it is not going to be further cuts. We need to follow that and MOPAC needs to...
  • Maze Hill Station

    • Reference: 2012/0062-1
    • Question by: Len Duvall OBE
    • Meeting date: 20 June 2012
    Residents in the Maze Hill area remain disappointed and dismayed at TfL and Southeastern Trains that it has taken over two years to provide a dedicated direct access route to Maze Hill station platform. Will the Mayor intervene on behalf of residents and now fast track this work before the Olympics?
  • Maze Hill Station 2

    • Reference: 2012/0063-1
    • Question by: Len Duvall OBE
    • Meeting date: 20 June 2012
    Residents in the Maze Hill area remain disappointed and dismayed at TfL and Southeastern Trains that it has taken over two years to provide an Oyster card reader at the dedicated direct access route at Maze Hill station platform. Will the Mayor intervene on behalf of residents and now fast track this work before the Olympics?
  • Oyster Card Top-Up

    • Reference: 2012/0064-1
    • Question by: Len Duvall OBE
    • Meeting date: 20 June 2012
    Will the Mayor investigate reports that there were faults with Oyster Card on 12th and 13th May that lead to commuters being double charged for auto top-ups?
  • Southern Way/Bugsby's Way Junction, Greenwich

    • Reference: 2012/0065-1
    • Question by: Len Duvall OBE
    • Meeting date: 20 June 2012
    Southern Way/Bugsby's Way/Commercial Way forms a four arm traffic signal junction that has seen a series of accidents, many involving buses. Despite best efforts by the Council to ensure the safety of pedestrians, TfL continues to place the blame for these accidents on the road system. Will the Mayor intervene on this matter and launch an investigation?
  • River Crossings

    • Reference: 2012/0066-1
    • Question by: Len Duvall OBE
    • Meeting date: 20 June 2012
    With regard to your river crossings Scheme, what assessment has the Mayor made of the expectations of the Royal Borough of Greenwich and the Thames Gateway to ensure convergence is achieved in line with the London Plan?
  • River Crossings 2

    • Reference: 2012/0067-1
    • Question by: Len Duvall OBE
    • Meeting date: 20 June 2012
    Since the consultation of the proposed plans for river crossings, what further assessment has the Mayor made of capacity issues for the schemes and can he provide a break down by project?
  • River Crossings 3

    • Reference: 2012/0068-1
    • Question by: Len Duvall OBE
    • Meeting date: 20 June 2012
    Will the Mayor release information on the cost estimates and possible funding sources for each project of the river crossing scheme?