Skip to main content
Mayor of London logo London Assembly logo
Home

Search questions

Filter results

Asked of 3

  • Step Change and Public Expectations (Supplementary) [4]

    • Question by: Darren Johnson
    • Meeting date: 10 December 2003
    What sort of increase have we seen?
  • East London River Crossing

    • Reference: 2003/0241
    • Question by: Darren Johnson
    • Meeting date: 11 June 2003
    Will the information provided to people during the current consultation on the East London River Crossing include an assessment of the impacts of extra traffic on air quality and health in East London? If the building of this bridge does generate extra traffic, will it make it more, or less likely that you meet the Governments targets, and the E.U. targets, for air quality in the boroughs of Newham, Greenwich and Lewisham? .
  • Road River Crossings

    • Reference: 2003/0242
    • Question by: Darren Johnson
    • Meeting date: 11 June 2003
    In the London Mayor's response to Jenny Jone's question 760/2003 he states that 'the options for river crossings were considered in a range of earlier studies'. Did any of these studies look at alternative sites for a road river crossing? Did such sites include provision of a local bridge with only one lane each way for private motorised transport? Did any of these sites include a bridge with provision for only buses, pedestrians and cyclists? .
  • East London River Crossing

    • Reference: 2003/0243
    • Question by: Darren Johnson
    • Meeting date: 11 June 2003
    Do you accept the conclusion in the John Elliot report 'a solution looking for a problem' (T2000, Mar 03) that the East London River Crossing will be capable of handling between 6,000 to 8,000 vehicles an hour in the morning peak? .
  • Incinerators

    • Reference: 2002/0231-1
    • Question by: Darren Johnson
    • Meeting date: 13 November 2002
    Is the Mayor's waste strategy strong enough to avoid the need for new incinerators in London? .
  • Waste Minimisation and Reduction

    • Reference: 2002/0234-1
    • Question by: Darren Johnson
    • Meeting date: 13 November 2002
    Are the Mayor's advisors committed to a strong policy for waste minimisation and reduction? .
  • Implementation and Partnerships (Supplementary) [14]

    • Question by: Darren Johnson
    • Meeting date: 13 November 2002
    Just quickly on the wheelie bins. Is it not the question of how large or small the wheelie bins are and that local authorities have tended to invest in wheelie bins that have turned out to be far too big, that people can shove everything in. If instead they had gone for smaller bins it would have created a lot less problems. When they look at replacing bins, as part of the general replacement programme, they need to look at the smaller size in place of the big ones.
  • New Combustion Technologies

    • Reference: 2001/0237-1
    • Question by: Darren Johnson
    • Meeting date: 14 November 2001
    Are you aware that the Thermoselect HTR (High Temperature Recycling) flagship Plant at Karlsruhe, (quoted in the Draft Waste Strategy as having `emissions of less than 10% of those permitted by the German Regulations') was closed down in October 2000 for at least seven months because of a breach of German emission regulations? How will this affect the Waste Strategy's stance on new combustion technologies? .
  • Effective Working Partnerships (Supplementary) [14]

    • Question by: Darren Johnson
    • Meeting date: 14 November 2001
    So other changes will be made during the public consultation stage, not during the Assembly consultation stage? You'll really just be noting the London Waste Action stakeholder dialogue comments at the moment, you won't be making any changes on those until they go to public consultation?
  • New Combustion Technologies (Supplementary) [2]

    • Question by: Darren Johnson
    • Meeting date: 14 November 2001
    So you think there's generally no problem then? It's the sort of plant that you'd like to see research in for getting in to London then?