  • Chamberlayne Road

    • Reference: 2014/3047
    • Question by: Navin Shah
    • Meeting date: 10 September 2014
    Further to my question 2014/2845, will you now facilitate a meeting between TfL, residents and Brent Council to discuss residents’ concerns about Chamberlayne Road (Kensal Rise) which is causing congestion, noise-pollution, safety issues and is generally detrimental impact on local residents from extraordinary volume of buses?
  • TfL maps

    • Reference: 2012/0021-1
    • Question by: Navin Shah
    • Meeting date: 20 June 2012
    There are published maps of both London Underground and London Rail lines, with detailed predicted levels of passenger congestion, which inform the democratic debate about reducing congestion. Would you agree to publish and maintain equivalently-detailed maps of under-use of existing London rail transport corridors, compared to their estimated maximum passenger capacity (whatever the current train service), which could contribute to discussions about population increases in London?
  • Oyster LED Displays

    • Reference: 2012/0022-1
    • Question by: Navin Shah
    • Meeting date: 20 June 2012
    How old are the earliest current Oyster gates at stations, and what is their predicted lifespan? Do you accept that many of the green and red LED displays have degraded so much it is sometimes impossible to see if they are entry or exit gates? When will you upgrade the displays?
  • Orbital Rail

    • Reference: 2012/0023-1
    • Question by: Navin Shah
    • Meeting date: 20 June 2012
    Do you acknowledge the benefits of deflecting demand away from central London-bound journeys, into orbital and contra-flow radial journeys? What steps are you taking, regarding your promise to build orbital extensions to Croydon trams and the DLR, to meet at Bromley North, for instance?
  • Recycling on the Overground

    • Reference: 2012/0024-1
    • Question by: Navin Shah
    • Meeting date: 20 June 2012
    Thank you for your response to Question No. 928/2012. Can you confirm that London Overground stations that have multiple kinds of litter bins really do maintain separate processing streams for material put into "paper", "plastic" and general litter bins by passengers? How are the streams handled, and how pure are they? Are there predicted figures for final separated waste stream proportions, and have they proved to be accurate?
  • Jubilee Line (1)

    • Reference: 2012/0025-1
    • Question by: Navin Shah
    • Meeting date: 20 June 2012
    What have you done in response to the frequent breakdowns of the specially designed Queen Jubilee Line trains?
  • Jubilee Line (2)

    • Reference: 2012/0026-1
    • Question by: Navin Shah
    • Meeting date: 20 June 2012
    How do you intend to improve the quality of the Jubilee line for Londoners who constantly experience delays and breakdowns?
  • Strikes

    • Reference: 2012/0027-1
    • Question by: Navin Shah
    • Meeting date: 20 June 2012
    Given the recent threat of strikes by the RMT, will you meet and negotiate with the drivers, to avoid the disruption to our transport system during the Olympics?
  • Racism on the Underground

    • Reference: 2012/0028-1
    • Question by: Navin Shah
    • Meeting date: 20 June 2012
    With regards to the rising number of racist abuse cases on the underground, what are you plans for tackling this issue?
  • Security arrangements during the Olympics

    • Reference: 2012/0029-1
    • Question by: Navin Shah
    • Meeting date: 20 June 2012
    What special measures are you taking to ensure the safety of passengers on the underground during the Olympics?