Skip to main content
Mayor of London logo London Assembly logo
Home

Search questions

Filter results

Asked of 1

  • Sustainable Management System (Supplementary) [14]

    • Question by: Dee Doocey
    • Meeting date: 08 September 2005
    There has to be something ready, and you must engage with Londoners.
  • Sustainable Management System (Supplementary) [5]

    • Question by: Dee Doocey
    • Meeting date: 08 September 2005
    Fine, but just can you please tell us about it, because if I do not know, what chance is there that local builders know? Can I just make one final point: speed is of the essence. The Construction Industry Training Board estimate that 88,000 recruits are needed over the next five years ' not in 10 years' time, but over the next five years. You need to get your act together, and you need to get your act together now. Bob Blackman (AM): To build on those questions: the International Olympic Committee (IOC) had a key concern, which was the...
  • Sustainable Management System (Supplementary) [10]

    • Question by: Dee Doocey
    • Meeting date: 08 September 2005
    I am sure you could.
  • Alternative sites for Travellers

    • Reference: 2005/0276-1
    • Question by: Jenny Jones
    • Meeting date: 08 September 2005
    What alternative sites are being provided for the Traveller families displaced by the Olympics?
  • Waterways

    • Reference: 2005/0278-1
    • Question by: Jenny Jones
    • Meeting date: 08 September 2005
    Given the massive potential for waterborne freight in the Lower Lea Valley, will the Olympic construction contracts require that construction companies make full use of the waterways surrounding the Olympics site to transport materials and waste?
  • Waterways

    • Reference: 2005/0279-1
    • Question by: Jenny Jones
    • Meeting date: 08 September 2005
    What will be done to ensure that the potential for waterborne fright in the Lower Lea Valley is maximised during the legacy phase of the Olympics?
  • Waterways

    • Reference: 2005/0280-1
    • Question by: Jenny Jones
    • Meeting date: 08 September 2005
    As a new lock at the junction of Prescott Channel and Abbey Creek could significantly increase the potential of the River Lea to carry freight, why does planning report PDU/0909a,b,c,d/02 stipulate that no new impounding structures be permitted?
  • Waterways

    • Reference: 2005/0281-1
    • Question by: Jenny Jones
    • Meeting date: 08 September 2005
    Are there any plans to recommission Cody Dock for use by waterborne freight carriers?
  • Waterways

    • Reference: 2005/0282-1
    • Question by: Jenny Jones
    • Meeting date: 08 September 2005
    During the initial construction phase of the Olympics, will facilities such as depots and concrete plants be placed in waterside locations?
  • Job opportunities

    • Reference: 2005/0283-1
    • Question by: Jenny Jones
    • Meeting date: 08 September 2005
    What is currently being done to ensure that local people are encouraged to make the most of job opportunities surrounding the Olympics? For example, will special courses be set up to help local people gain skills in areas such as construction?