  • Transport for the Games (Supplementary) [3]

    • Question by: Roger Evans
    • Meeting date: 08 September 2005
    How will the OTA be made up? Who will appoint the members?
  • Transport for the Games (Supplementary) [4]

    • Question by: Roger Evans
    • Meeting date: 08 September 2005
    What you are saying, though ' and I can understand the imperatives ' is basically that the transport needs of the Olympics, those couple of weeks, are going to be paramount over the transport needs of Londoners, as interpreted by TfL. How will a dispute of that sort be resolved?
  • Transport for the Games (Supplementary) [5]

    • Question by: Roger Evans
    • Meeting date: 08 September 2005
    Then there will not be another road grab beyond the one that is currently in progress?
  • Transport for the Games (Supplementary) [6]

    • Question by: Roger Evans
    • Meeting date: 08 September 2005
    What if the OTA has a dispute with the boroughs and the roads that they operate? Who resolves that problem, then?
  • Transport for the Games (Supplementary) [7]

    • Question by: Roger Evans
    • Meeting date: 08 September 2005
    Just so we can understand what are the implications of that, you talk about developing an Olympic road network. Is that just going to be roads which are currently part of the TfL strategic road network, or do you see that network including a lot more borough roads and being a lot wider?
  • Contamination of Lower Lea Valley

    • Reference: 2005/0293-1
    • Question by: Roger Evans
    • Meeting date: 08 September 2005
    How much land in the Lower Lea Valley is contaminated?
  • Contamination

    • Reference: 2005/0294-1
    • Question by: Roger Evans
    • Meeting date: 08 September 2005
    What is the nature of that contamination?
  • Contamination

    • Reference: 2005/0295-1
    • Question by: Roger Evans
    • Meeting date: 08 September 2005
    What is the estimated cost of de-contaminating the land? What is the timescale needed to carry out all neccessary work, before actual building work begins?
  • works/maintenance

    • Reference: 2005/0311-1
    • Question by: Roger Evans
    • Meeting date: 08 September 2005
    What planned transport works/maintenance will be delayed or abandoned resulting from London winning the 2012 Olympic games?
  • Transport improvements

    • Reference: 2005/0313-1
    • Question by: Peter Hulme Cross
    • Meeting date: 08 September 2005
    The principal, major transport improvements expected before 2012 include: the completion of the Channel Tunnel Rail Link to St Pancras; north and south extensions and upgrades to the East London Line; longer trains, and extensions to the Docklands Light Railway; significant improvements to the transport hubs at Kings Cross/St Pancras and Stratford and the building of the West London tram. The successful bid also means that capacity on the North London Line will be greatly improved. Can you confirm that all these things will occur before 2012?