Asked of 1

  • Holborn Gyratory

    • Reference: 2021/3268
    • Question by: Caroline Pidgeon
    • Meeting date: 02 September 2021
    Please provide an update on (a) TfL’s investigation into the recent fatality at Holborn Gyratrory, and (b) the exact timescale for vital improvements to be made at this junction.
  • Closure of the Bank branch of the Northern Line

    • Reference: 2021/3269
    • Question by: Caroline Pidgeon
    • Meeting date: 02 September 2021
    Following the closure of the Bank branch of the Northern line, from Kennington to Moorgate for 17 weeks from January 2022 to facilitate the final stages of work on Bank station, what alterations will TfL be undertaking to bus routes?
  • TfL and Network Rail engineering work over the Christmas period

    • Reference: 2021/3270
    • Question by: Caroline Pidgeon
    • Meeting date: 02 September 2021
    Please provide an update on the negotiations between Network Rail and TfL over engineering work on rail routes to Heathrow airport? Can you provide an assurance that Tube and rail routes will not be simultaneously out of operation on Boxing Day? Please also provide an update on the specific provision that will be in place for people with accessibility needs.
  • Action to reach Vision Zero goal (2)

    • Reference: 2021/3271
    • Question by: Siân Berry
    • Meeting date: 02 September 2021
    Thank you for your answer to my question 2021/1473, has Transport for London (TfL) now drafted the plan to which you referred which would accelerate work on vision zero and improve safety at the most dangerous junctions?
  • Lower Thames Crossing

    • Reference: 2021/3272
    • Question by: Siân Berry
    • Meeting date: 02 September 2021
    What involvement has Transport for London (TfL) had in the proposed Lower Thames Crossing, which is now budgeted at £6.3bn, and are you supporting this proposed new motorway?
  • Analysis of walking and cycling crossings of Thames

    • Reference: 2021/3273
    • Question by: Siân Berry
    • Meeting date: 02 September 2021
    Can you share the most recent assessment by Transport for London (TFL) of gaps between crossings of the Thames for people walking and cycling?
  • Speed limits on Thames crossings

    • Reference: 2021/3274
    • Question by: Siân Berry
    • Meeting date: 02 September 2021
    What are the current speed limits for each road bridge across the Thames, and when did they last change?
  • Publication of review of flood risks

    • Reference: 2021/3275
    • Question by: Siân Berry
    • Meeting date: 02 September 2021
    Will you publish the 2016 London Underground Comprehensive Review of Flood Risks, and subsequent work on surface water flooding by Transport for London (TfL), and if not will you explain what prevents you from sharing it?
  • Transport infrastructure affected by flooding

    • Reference: 2021/3276
    • Question by: Siân Berry
    • Meeting date: 02 September 2021
    Since your answer to 2019/19667, there have been several new occurrences of flooding to infrastructure operated by Transport for London (TfL). Can you list for the last two years since that answer: a) what stations or other transport infrastructure were closed due to flooding, b) how long they were closed, and c) the dates they were closed?
  • Active travel investment per head for last five years

    • Reference: 2021/2208
    • Question by: Siân Berry
    • Meeting date: 10 June 2021
    What was your investment in walking and cycling per head of population in London for each of the years: 2016-17, 2017-18 2018-19, 2019-20, and 2020-21?