- Reference: 2018/2372
- Question by: Steve O'Connell
- Meeting date: 13 September 2018
In both the morning and afternoon peak, Pampisford Rd, traffic going north at the junction with Christchurch Rd, is always stacking back onto Pampisford Rd with traffic held by the very short phasing period of time for the traffic lights on Brighton Rd. If, as I suspect, my constituents suffer excessive delays for the 412 at peak times, will Transport for London reconsider their changes?