Skip to main content
Mayor of London logo London Assembly logo
Home

Search questions

Filter results

  • Funding for Taxi Ranks

    • Reference: 2016/1200
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    The taxi trade were told that £600,000 was going to be spent on taxi ranks but recent reports say that £150,000 of that amount will be spent on a review. Please explain why; the taxi trade were initially led to believe that the entire amount would be spent on new taxi ranks.
  • Royal Family Associations with London's Transport Network

    • Reference: 2016/1210
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    When was the last time any member of the Royal Family used a tube or bus in London?
  • TfL's Sub-surface Signal Contract

    • Reference: 2016/1211
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    What is the opportunity cost of TfL's problems on the sub-surface signal contract for the tube, which is going to be five years delayed and cost £ 900m more to deliver?
  • Crossrail 2 Station at Imperial Wharf

    • Reference: 2016/1212
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    What work has TfL done with the local council to determine the feasibility of Crossrail 2 station at Imperial Wharf?
  • Energy cost reductions for TfL

    • Reference: 2016/1213
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    With the wholesale costs of energy significantly reduced, what savings will TfL be making both annually and cumulatively up to 2020?
  • Debt costs for TfL

    • Reference: 2016/1214
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    Are TfL currently receiving a better deal on their debt than is offered by the public works loan board? As a result, what savings are being made annually and cumulatively up to 2020?
  • Fast Tracking the Garden Bridge

    • Reference: 2016/1216
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    TfL are currently investigating as many as 13 new connections across the River Thames, how can you explain the fast tracking of the Garden Bridge?
  • Crossrail 2 Station at Imperial Wharf (1)

    • Reference: 2016/1217
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    What work has TfL recently done with the local authority (Hammersmith and Fulham) for the feasibility of Crossrail 2 station at Imperial Wharf?
  • Crossrail 2 Station at Imperial Wharf (2)

    • Reference: 2016/1218
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    Will the Imperial Wharf proposal for Crossrail 2, currently being discussed with the local authority, have a better link to river services along the Thames?
  • Additional Red Routes to Ease Congestion

    • Reference: 2016/1222
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    Red routes in London were established after a consultation in June 1992 and formed the basis of TfL Road Network in 2000. After more than two decades and a whole lot more congestion, it is not time to have another consultation and extended the Red Routes in Greater London?