  • Fuel Poverty Strategy

    • Reference: 2016/1084
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    Why after eight years as Mayor does London still not have a fuel poverty strategy?
  • A Toxic Legacy

    • Reference: 2016/1085
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    In 2008 you promised to make London "the greenest city in the world". Can you honestly say that the London of 2016 is what you had in mind when you made that statement?
  • Closure of Tower Bridge

    • Reference: 2016/1099
    • Question by: John Biggs
    • Meeting date: 16 March 2016
    When Tower Bridge is closed for maintenance for an extended period later this year, will you work with the Corporation to examine options to make the bridge more cyclist friendly by including a segregated cycle path and/or removal of the guard rails?
  • East-West Cycle Superhighway

    • Reference: 2016/1100
    • Question by: John Biggs
    • Meeting date: 16 March 2016
    How will the new East-West Cycle Superhighway connect safely with CS3? When will the link be completed?
  • Electrification of the Barking - Gospel Oak Rail Route

    • Reference: 2016/1101
    • Question by: John Biggs
    • Meeting date: 16 March 2016
    As the railway between Barking, Woodgrange Park and Forest Gate Junction is already electrified and will remain open while the rest of the route is closed for electrification, will London Overground continue to operate trains between Barking (platforms 1, 7 or 8) and Woodgrange Park where turn back facilities are already provided?
  • Electric Trains for Barking - Gospel Oak Service

    • Reference: 2016/1102
    • Question by: John Biggs
    • Meeting date: 16 March 2016
    Could the Mayor please explain why it not viable to lease electric trains to fill the gap between the completion of the electrification and platform extension projects in mid 2017 and the arrival in passenger service of the new Class710 electric trains in April 2018? Class315 electric trains on TfL Rail duties will be replaced by new Crossrail Class345 trains from early 2017 and the Class315 trains are not currently designated for any further use. Could not the lease of ten of these Class315 trains be extended for 10-12 months to enable them to be transferred to the electrified Barkng...
  • Crossrail and Lords Hill Bridge Refurbishment

    • Reference: 2016/1190
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    Residents of Bayswater and Warwick Estate have pointed out the poor state of Lords Hill Bridge, immediately outside Royal Oak tube station. Now that Crossrail works are coming to a close in Paddington, when can we expect a complete refurbishment of the bridge for both pedestrian and car traffic?
  • Baker Street Tube Noise

    • Reference: 2016/1191
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    When l raised concerns about tube noise from residents who live near Baker Tube station at a Mayor's Question Time on 17 June 2015 you responded by saying: "We are going to have a 24-hour Tube but we cannot be rattling people's teacups at 3.00am and so we will sort that out." Are you satisfied that TfL have addressed these concerns before the night service begins in May?
  • Hatton Cross Station (1)

    • Reference: 2016/1192
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    Hatton Cross Underground tube station is a main interchange between tube and local bus services for local residents and people working at Heathrow Airport. Why has a lift not been installed? This would not only help those with disabilities but also those with heavy luggage and children.
  • Hatton Cross Station (2)

    • Reference: 2016/1193
    • Question by: Murad Qureshi
    • Meeting date: 16 March 2016
    The wifi works on the platform of the Hatton Cross underground station but not in the bus waiting area above. Can you extend the connection for all passengers using the interchange?