- Reference: 2024/1681
- Question by: Caroline Russell
- Meeting date: 23 May 2024
In Schedule 10 – Design and Construction Requirements of the agreement between Transport for London (TfL) and Riverlinx to build the Silvertown Road Tunnel, there was an outdated reference in section 2.1.2 to the 2014 edition of the London Cycle Design Standards (LCDS). What standards is TfL expecting Riverlinx to build cycling elements of the Silvertown Road Tunnel to, and has TfL requested any update or correction to the project agreement?