Skip to main content
Mayor of London logo London Assembly logo
Home

Search questions

Filter results

  • Hammersmith Bridge (3)

    • Reference: 2017/4908
    • Question by: Caroline Pidgeon
    • Meeting date: 14 December 2017
    When does TfL expect the repair and strengthening work to Hammersmith Bridge to be completed?
  • Transformation of Oxford Street (1)

    • Reference: 2017/4909
    • Question by: Caroline Pidgeon
    • Meeting date: 14 December 2017
    In which month in 2018 will Transport for London and Westminster City Council consult on a high-quality east-west cycle route to the north of Oxford Street?
  • Transformation of Oxford Street (2)

    • Reference: 2017/4910
    • Question by: Caroline Pidgeon
    • Meeting date: 14 December 2017
    How many people cycle daily on Oxford Street, Grosvenor Street, Brook Street, Wigmore Street, Upper Berkeley Square and George Street, respectively, and how they will benefit from the transformation of Oxford Street?
  • Transformation of Oxford Street (3)

    • Reference: 2017/4911
    • Question by: Caroline Pidgeon
    • Meeting date: 14 December 2017
    It is proposed that traffic is removed from Oxford Street west by December 2018. What improvements for cycling and cycle parking will be made to surrounding streets by this date?
  • Cycling in the TfL Budget 2018/19 (1)

    • Reference: 2017/4912
    • Question by: Caroline Pidgeon
    • Meeting date: 14 December 2017
    Are you confident that Transport for London's 2018/19 budget spend of £154 million on cycling will be fully allocated?
  • Cycling in the TfL Budget 2018/19 (2)

    • Reference: 2017/4913
    • Question by: Caroline Pidgeon
    • Meeting date: 14 December 2017
    What funding will be set aside for Cycle Superhighways, Quietways, mini-Hollands, Liveable Neighbourhoods and Safer Junctions, respectively, in 2018/19?
  • Ealing Broadway Crossrail station

    • Reference: 2017/4914
    • Question by: Caroline Pidgeon
    • Meeting date: 14 December 2017
    Will you ensure that the lifts installed at the new Ealing Broadway Crossrail Station meet the design standards set out in the London Cycling Design Standard such as having minimum dimensions of 1.2 by 2.3 metres?
  • Cycle Superhighway 4

    • Reference: 2017/4915
    • Question by: Caroline Pidgeon
    • Meeting date: 14 December 2017
    Why has TfL not proposed that Cycle Superhighway 4 reaches Greenwich town centre and then continues onto Woolwich?
  • London Cycling Design Standards

    • Reference: 2017/4916
    • Question by: Caroline Pidgeon
    • Meeting date: 14 December 2017
    What steps are being taken to ensure the London Cycling Design Standard for the size of lifts is routinely implemented in plans for new lifts across TfL controlled stations?
  • London Health Board

    • Reference: 2017/4917
    • Question by: Caroline Pidgeon
    • Meeting date: 14 December 2017
    Will you ensure that the London Health Board starts to hold its meetings in public and that the meetings are transcribed and fully minuted?