  • Airport connectivity

    • Reference: 2012/0049-1
    • Question by: Murad Qureshi
    • Meeting date: 20 June 2012
    What are you doing to improve connectivity between London airports both within Greater London and in the South East?
  • Air Quality

    • Reference: 2012/0050-1
    • Question by: Murad Qureshi
    • Meeting date: 20 June 2012
    Can TfL substantiate the claim made by the Mayor at the MQT session on 23rd May that air quality had improved over his first political term?
  • Congestion levels outside the Congestion Charging Zone

    • Reference: 2012/0051-1
    • Question by: Murad Qureshi
    • Meeting date: 20 June 2012
    What are the present levels of congestion in central London at peak times immediately inside and outside the congestion charge zone?
  • Congestion and air quality

    • Reference: 2012/0052-1
    • Question by: Murad Qureshi
    • Meeting date: 20 June 2012
    Are the levels of vehicles which are stationary or idling in traffic because of congestion during peak times contributing to poor air quality in Central London?
  • Anti-idling enforcement

    • Reference: 2012/0053-1
    • Question by: Murad Qureshi
    • Meeting date: 20 June 2012
    How are you enforcing your short term measures on idling engines along the Marylebone and Euston Roads?
  • New jobs from Crossrail

    • Reference: 2012/0054-1
    • Question by: Murad Qureshi
    • Meeting date: 20 June 2012
    Now that the tunnelling has began at Royal Oak in Paddington, what are the numbers of jobs and apprenticeships being produced for local residents on a monthly basis?
  • Lorry movements at Royal Oak portal

    • Reference: 2012/0055-1
    • Question by: Murad Qureshi
    • Meeting date: 20 June 2012
    What measures have been taken to limit the impact of lorry movements for the tunnel segments going into Royal Oak portal in Paddington?
  • Crossrail service levels

    • Reference: 2012/0056-1
    • Question by: Murad Qureshi
    • Meeting date: 20 June 2012
    When do you expect during this new term to begin negotiating service levels for Crossrail after its construction?
  • Linking Crossrail with HS2

    • Reference: 2012/0057-1
    • Question by: Murad Qureshi
    • Meeting date: 20 June 2012
    What work has Crossrail done to link the line with HS2 at Old Oak Common?
  • 150 years of the Tube

    • Reference: 2012/0058-1
    • Question by: Murad Qureshi
    • Meeting date: 20 June 2012
    What are you doing to celebrate the 150th anniversary of the tube system along the Paddington to Farringdon tracks?