Skip to main content
Mayor of London logo London Assembly logo
Home

Search questions

  • Underpass at Walthamstow Central

    • Reference: 2007/2807
    • Question by: Jennette Arnold OBE
    • Meeting date: 12 December 2007
    Can the Mayor offer reassurance to commuters and residents in my constituency that the underpass between the Victoria Line and the bus station at Walthamstow Central, now opened after a very significant overrun, will have step-free access via the new lifts sooner than the six months currently estimated for an electricity sub-station to become operational in order to power them?
  • Place and Value of Public Art

    • Reference: 2007/2837
    • Question by: Jennette Arnold OBE
    • Meeting date: 12 December 2007
    With the recent unveiling of Thomas Schutte's `Model for a Hotel 2007' on the Fourth Plinth in Trafalgar Square and the announcement of the prestigious shortlist of artists for the next commission round, will the Mayor join with me in hoping that his initiative will inspire boroughs and developers to become more actively involved in the debate about the place and value of public art?
  • Jobs at Stratford City

    • Reference: 2007/2802
    • Question by: Jennette Arnold OBE
    • Meeting date: 12 December 2007
    During the development of Stratford City a significant number of people in surrounding London Boroughs will have the opportunity to find work. What estimates are there of the numbers of jobs that will be filled by workers from each of the adjacent London Boroughs?
  • Stoke Newington Gyratory II

    • Reference: 2007/0187-1
    • Question by: Jennette Arnold OBE
    • Meeting date: 05 December 2007
    Do you agree with a recent report in the Evening Standard that placed the Stoke Newington Gyratory amongst the top 12 most dangerous Gyratories?
  • Travelling to shopping centres

    • Reference: 2007/0247-1
    • Question by: Jennette Arnold OBE
    • Meeting date: 05 December 2007
    Comparing the travelling times from people living in Chingford and Walthamstow to Stratford City, Bluewater and Lakeside Shopping Centres, which shopping centres are most likely to be visited?
  • Stoke Newington Gyratory III

    • Reference: 2007/0189-1
    • Question by: Jennette Arnold OBE
    • Meeting date: 05 December 2007
    The Stoke Newington Gyratory has had a project manager for several months, will you update me on the initial findings of the feasibility study?
  • Stoke Newington Gyratory I

    • Reference: 2007/0235-1
    • Question by: Jennette Arnold OBE
    • Meeting date: 05 December 2007
    I understand that TfL have a Reserve list for projects which are important but require financial backing, can you confirm that the Stoke Newington Gyratory is on the list?
  • Illegal Right Turns

    • Reference: 2007/0236-1
    • Question by: Jennette Arnold OBE
    • Meeting date: 05 December 2007
    Can you confirm how many contraventions for illegal right turns have been caught on camera where drivers turns right from Grosvenor Place into Halkin Street, SW1X?
  • Road Arrow Sign

    • Reference: 2007/0237-1
    • Question by: Jennette Arnold OBE
    • Meeting date: 05 December 2007
    There is a single traffic sign which is obscured most of the time by other vehicles and also an illegible road arrow which has been missed out in the repainting of the scheme at the junction of Grosvenor Place into Halkin Street SW1X, can you reassure me that the single traffic sign will be repositioned for clearer visibility and also that the Road Arrow sign will be repainted immediately?
  • ELLX Phase 2

    • Reference: 2007/0238-1
    • Question by: Jennette Arnold OBE
    • Meeting date: 05 December 2007
    Although on the opposite side of the River from my constituency, many of my constituents especially in Hackney have no less an interest in the final completion of the East London Line Extensions (ELLX) package and the creation of an Outer Circle rail link around Inner London. For Hackney it will mean a one-third increase in train service frequency to and from Dalston Junction and our other three new stations, as well as a wider choice of destinations and connections in south London. What are the current prospects for securing the estimated £100 million for London Rail to be able...