Skip to main content
Mayor of London logo London Assembly logo
Home

Search questions

Filter results

Asked of 2

  • DLR

    • Reference: 2003/0165
    • Question by: Diana Johnson
    • Meeting date: 11 June 2003
    Why is there such a short boarding time on the DLR trains leaving Tower Gateway ? Is TfL aware that this is a problem for those passengers with mobility problems and currently there is no signage to indicate that passengers need to board very quickly as the train will depart immediately .
  • Strategic Review of Highways

    • Reference: 2003/0166
    • Question by: Valerie Shawcross
    • Meeting date: 11 June 2003
    If in future TfL proposes major works to non TfL roads and junctions will it fund theses schemes within exist Borough bidding processes or open up a new line of funding, to ensure that local Council priorities are not displaced? .
  • Speeding motorbikes

    • Reference: 2003/0167
    • Question by: Valerie Shawcross
    • Meeting date: 11 June 2003
    Are motorbikes of above 50cc a danger in London ? .
  • Noise Nuisance

    • Reference: 2003/0168
    • Question by: Valerie Shawcross
    • Meeting date: 11 June 2003
    Should there be public controls on noise levels being emitted by car stereo systems when cars are driven by inconsiderate idiots? Is this not just another form of unnecessary noise pollution which should be outlawed? .
  • The River

    • Reference: 2003/0169
    • Question by: Valerie Shawcross
    • Meeting date: 11 June 2003
    Why is the existing River bus system so under developed and when are you going to do something serious about this? .
  • The River Bus

    • Reference: 2003/0170
    • Question by: Valerie Shawcross
    • Meeting date: 11 June 2003
    Have you looked at different pricing schemes to make London river buses affordable for Londoners? .
  • Capacity Study of the Jubilee Line

    • Reference: 2003/0171
    • Question by: Valerie Shawcross
    • Meeting date: 11 June 2003
    Has TfL undertaken a study to examine how the Jubilee line will shape up to the extra pressures that will be placed on the line, following new developments at north Greenwich and Canary Wharf? What plans does TfL have in place if additional services prove necessary? .
  • Bus Transfer

    • Reference: 2003/0172
    • Question by: Meg Hillier
    • Meeting date: 11 June 2003
    Are New York-style single-journey bus transfers a realistic possibility for London? .
  • 227 Bus

    • Reference: 2003/0173
    • Question by: Len Duvall OBE
    • Meeting date: 11 June 2003
    In light of previous answers from the Mayor on accessibility of buses what evaluation has TfL and the local highways authority made of the ease of disembarkartion of my constituents with mobility difficulties or small children from the 227 bus stops at the Greyhound and Market Square in Bromley? .
  • Bus Services

    • Reference: 2003/0175
    • Question by: John Biggs
    • Meeting date: 11 June 2003
    Can the Mayor confirm which of the enhancements to bus services which have been proposed by TfL for early 2003 have been introduced and provide the dates at which those improvements which have not yet been made will be introduced ? .