Skip to main content
Mayor of London logo London Assembly logo
Home

Search questions

Filter results

Asked of 2

  • Low carbon building refurbishment

    • Reference: 2010/0075-1
    • Question by: Darren Johnson
    • Meeting date: 08 September 2010
    Can you break down LFEPA's expenditure on the Building Energy Efficiency Programme (BEEP), now known as RE:FIT, in 2009/10 and 2010/11 by the source of funding (i.e. LFEPA capital, LDA grant, etc.)?
  • Low carbon refurbishment of fire stations

    • Reference: 2010/0076-1
    • Question by: Darren Johnson
    • Meeting date: 08 September 2010
    Will the Building Energy Efficiency Programme (now known as RE:FIT) for 10 fire stations be deferred again in the 2011/12 budget?
  • Energy efficiency measures

    • Reference: 2010/0077-1
    • Question by: Darren Johnson
    • Meeting date: 08 September 2010
    Are you considering any changes to the planned expenditure on energy efficiency measures (outside the BEEP/ RE:FIT programme) up to 2014/15, as a result of the Mayor's budget guidance?
  • Provisions of Consultancy (Supplementary) [1]

    • Question by: Darren Johnson
    • Meeting date: 18 January 2006
    If you felt that you were surplus to requirements and that you did not have a useful role to play at TfL, might you consider terminating your consultancy sooner rather than later?
  • Provisions of Consultancy (Supplementary) [2]

    • Question by: Darren Johnson
    • Meeting date: 18 January 2006
    You obviously bring undoubted expertise in this consultancy role, but what might you be doing that Peter Hendy would be incapable of doing?
  • Extension to Victoria Underground Lines Southwards to Herne Hill (Supplementary) [3]

    • Question by: Darren Johnson
    • Meeting date: 06 April 2005
    On the West London Tram, will there be an additional large pot of money to tackle traffic reduction and rat-running, as we saw with Congestion Charging, not only an important measure but an important measure in terms of building public confidence before the scheme goes ahead?
  • Extension to Victoria Underground Lines Southwards to Herne Hill (Supplementary) [6]

    • Question by: Darren Johnson
    • Meeting date: 06 April 2005
    Has the budget been earmarked for that as part of the overall budget provisions?
  • West London Tram

    • Reference: 2005/0083-1
    • Question by: Darren Johnson
    • Meeting date: 06 April 2005
    Will you take up the recommendation of the Green/Labour minority report on the West London Tram, to have a large package of additional traffic reduction measures, such as Safe Route to School schemes, Car Clubs, Cycling facilities etc? Will there be an additional, large pot of money, like there was on Congestion Charging, to help traffic reduction and stop rat running?
  • Zero Emission Vehicles

    • Reference: 2005/0085-1
    • Question by: Darren Johnson
    • Meeting date: 06 April 2005
    When are we going to see the next generation of hydrogen fuel cell and other zero emission vehicles, on the streets of London?
  • Ultra Light Railway

    • Reference: 2005/0088-1
    • Question by: Darren Johnson
    • Meeting date: 06 April 2005
    Have TfL fully evaluated the potential of Ultra Light Rail (ULR) for use in London given that both the East London Transit and the Greenwich Waterfront Transit are being designed to allow for an upgrade from buses should passenger numbers require it?