Asked of 2

  • Route Finding

    • Reference: 2007/0162-1
    • Question by: Jenny Jones
    • Meeting date: 05 December 2007
    The progress report on the Walking Plan in November 2006 set target dates for delivery of the pedestrian route finding system (Legible London). These dates are 2012 for Central London and the Olympic Parks and 2015 for the rest of London. Will these target dates be met?
  • One-way Systems

    • Reference: 2007/0163-1
    • Question by: Darren Johnson
    • Meeting date: 05 December 2007
    When was the last time a one-way gyratory road scheme was built using TfL funds or resources? Will TfL be supporting any further such schemes in the future? If so, where?
  • TIF

    • Reference: 2007/0165-1
    • Question by: Darren Johnson
    • Meeting date: 05 December 2007
    What transport projects in London are being funded under the Government's Transport Innovation Fund? Does TfL have plans to submit further bids for funding under this scheme at present?
  • Emissions from Taxis

    • Reference: 2007/0166-1
    • Question by: Darren Johnson
    • Meeting date: 05 December 2007
    What are the barriers stopping all new black cabs from being hybrids? Do you feel that the opening up of black cab production to wider competition is a potential solution if the current monopoly provider fails to come up with a suitable prototype in the coming year?
  • Emissions from mini-cabs

    • Reference: 2007/0167-1
    • Question by: Darren Johnson
    • Meeting date: 05 December 2007
    What action is being taken, or considered, to reduce CO2 emissions from mini cabs?
  • Traffic Growth

    • Reference: 2007/0168-1
    • Question by: Darren Johnson
    • Meeting date: 05 December 2007
    Can you provide a breakdown by borough of traffic growth since 2000? How does this pattern of traffic growth match the projections contained in the Mayor's Transport Strategy?
  • Energy Use by London Underground

    • Reference: 2007/0169-1
    • Question by: Darren Johnson
    • Meeting date: 05 December 2007
    What is the projected increase in energy use by London Underground between 2000 and 2025, if no energy conservation measures are taken?
  • CO2 emissions from LU

    • Reference: 2007/0170-1
    • Question by: Darren Johnson
    • Meeting date: 05 December 2007
    What is the projected overall amount of CO2 emissions from London Underground by 2025, assuming that no mitigation measures are taken, but taking into account the anticipated growth in passengers and the emissions saved through their shift away from other modes of transport?
  • Local Renewable Energy for LU

    • Reference: 2007/0171-1
    • Question by: Darren Johnson
    • Meeting date: 05 December 2007
    Are there any plans for London Underground (on its own or in partnership) to produce energy from local renewable sources by 2010? Is TfL providing investment funding or assistance through the contracts process for any companies to produce renewable energy for the Underground?
  • Tube Improvements

    • Reference: 2007/0173-1
    • Question by: Geoff Pope
    • Meeting date: 05 December 2007
    What improvements to the Tube network will be delayed or abandoned as a result of Metronet going into administration?