  • Underground safety (1)

    • Reference: 2010/2735
    • Question by: Jennette Arnold OBE
    • Meeting date: 15 September 2010
    Have the causes of the failure of the fire detection systems at Euston Station in July been investigated?
  • Underground safety (2)

    • Reference: 2010/2736
    • Question by: Jennette Arnold OBE
    • Meeting date: 15 September 2010
    Has there be an investigation into the ignition of an air conditioning unit at Oxford Circus Station in early August?
  • Underground safety (3)

    • Reference: 2010/2737
    • Question by: Jennette Arnold OBE
    • Meeting date: 15 September 2010
    How will you reassure passengers that their safety is guaranteed on the Underground after the recent fire incidents at Euston and Oxford Circus Stations?
  • Underground safety (4)

    • Reference: 2010/2738
    • Question by: Jennette Arnold OBE
    • Meeting date: 15 September 2010
    Following the two recent fire incidents at Euston and Oxford Circus Stations, I understand that it was alert staff members who immediately set the evacuation procedures in motion and prevented another disaster. How will passenger safety at Underground stations be guaranteed if 800 Underground jobs are cut, including safety critical jobs?
  • North London Line shelters

    • Reference: 2010/2739
    • Question by: Jennette Arnold OBE
    • Meeting date: 15 September 2010
    Increasing numbers of passengers are now using the North London Overground Line and as a result the existing shelters on a number of platforms in my constituency provide inadequate shelter from bad weather. Please confirm when new platform shelters will be provided at, Upper Holloway, Caledonian Road & Barnsbury Overground stations?
  • Disabled tube access

    • Reference: 2010/2740
    • Question by: Jennette Arnold OBE
    • Meeting date: 15 September 2010
    A BBC reporter went out to Stratford Station with a wheelchair user, and found that: • The gaps between the platforms and the Tube trains were such that the electric wheelchair needed to be carrier onto the carriage. • When the passenger tried to use the accessible lifts with his minder, as he was unable to operate the lift by himself, the lifts refused to close because they were overloaded. With Stratford International station being the flagship accessible entry to the Olympic and Paralympics site, what measure will taken to ensure full accessibility of this flagship station?
  • Role Models

    • Reference: 2010/2435
    • Question by: Jennette Arnold OBE
    • Meeting date: 14 July 2010
    What criteria do you use to select role models for London's Young people?
  • Olympic sponsorship

    • Reference: 2010/2431
    • Question by: Jennette Arnold OBE
    • Meeting date: 14 July 2010
    I have been inundated with emails from constituents objecting to a possible sponsorship of the 2012 Games by Proctor & Gamble. The company is known to conduct toxicity tests on animals for cosmetic and household products (the first practice being banned across the EU). What action are you taking to try and block this deal and reassure my constituents that Proctor & Gamble will not be considered for 2012 sponsorship?
  • Bus route 30 performance

    • Reference: 2010/2442
    • Question by: Jennette Arnold OBE
    • Meeting date: 14 July 2010
    Many of my constituents are deeply dissatisfied with the performance of bus route 30. Will you agree with me that some sections of this route are in need of further bus priority measures?
  • Disability Equality Scheme

    • Reference: 2010/2443
    • Question by: Jennette Arnold OBE
    • Meeting date: 14 July 2010
    Will you include the recommendations of the Transport Committee's investigation into door-to-door transport in your Disability Equality Scheme?