  • New Bus for London (2)

    • Reference: 2010/3896
    • Question by: Caroline Pidgeon
    • Meeting date: 15 December 2010
    Can you please list which mobility and accessibility groups TfL have consulted with over the design for the New Bus for London?
  • Junction of Abbey Street, Tower Bridge Road and Long Lane

    • Reference: 2010/3897
    • Question by: Caroline Pidgeon
    • Meeting date: 15 December 2010
    Over the last four years there have been 13 collisions out the junction of Abbey Street, Tower Bridge Road and Long Lane. Local residents also inform me that it is incredibly difficult to cross this junction. Will you instruct TfL to seriously look into this problem and come up with a solution?
  • Cycle Hire Scheme Expansion

    • Reference: 2010/3898
    • Question by: Caroline Pidgeon
    • Meeting date: 15 December 2010
    Will you consider extending the Cycle Hire Scheme further north than Cloudesley Road in Angel, N1?
  • Overrunning Works on the Jubilee Line

    • Reference: 2010/3899
    • Question by: Caroline Pidgeon
    • Meeting date: 15 December 2010
    Will you arrange for the Metropolitan Line to stop at Neasden when the Jubilee Line is not working, in view of the overrunning works on the Jubilee Line?
  • Will you come to Brent?

    • Reference: 2010/3900
    • Question by: Caroline Pidgeon
    • Meeting date: 15 December 2010
    Will you agree to travel on the rail replacement bus through Brent one weekend when the Jubilee Line and Metropolitan Line are not running, to experience the replacement services as Brent residents have had to endure for so long?
  • New Metropolitan Line Trains (1)

    • Reference: 2010/3901
    • Question by: Caroline Pidgeon
    • Meeting date: 15 December 2010
    Following the launch of the new Metropolitan Line train running between Wembley Park and Watford, can you confirm how many new trains are now in service and if it has been possible to extend the service?
  • New Metropolitan Line Trains (2)

    • Reference: 2010/3902
    • Question by: Caroline Pidgeon
    • Meeting date: 15 December 2010
    Can you provide the timetable currently proposed following the full introduction of the new Metropolitan Line trains, including routes covered and number of trains? If this has changed since the original plan please can you confirm why?
  • Transport Plans for the Royal Wedding 29th April

    • Reference: 2010/3903
    • Question by: Caroline Pidgeon
    • Meeting date: 15 December 2010
    Will you ensure the whole transport network is in service on April 29th 2011 so that Londoners and visitors can fully enjoy the Royal Wedding?
  • Number 18 Bus

    • Reference: 2010/3904
    • Question by: Caroline Pidgeon
    • Meeting date: 15 December 2010
    What issues have been identified by bus operators, Safer Transport teams, and TfL following the change of the number 18 bus to a double decker bus? Have any concerns been identified on other routes where similar changes have been made?
  • PR2 Bus Route

    • Reference: 2010/3905
    • Question by: Caroline Pidgeon
    • Meeting date: 15 December 2010
    What does the future hold for the PR2 and how will you improve bus transport in the Park Royal area? Does some form of Fast Bus feature in your plans?