  • Infrastructure in the Thames Gateway

    • Reference: 2004/0228-1
    • Question by: Roger Evans
    • Meeting date: 17 March 2004
    Where the Thames Gateway is concerned, we have not heard much about the provision of infrastructure apart from plans for transport in the area. What plans are there to provide gas and other necessary infrastructure in the Thames Gateway? Furthermore, the Thames Gateway area has a known risk of flooding and this being so, how does the LDA propose to defend development in Thames Gateway from this risk? .
  • LDA Leadership in East London (Supplementary) [1]

    • Question by: Roger Evans
    • Meeting date: 17 March 2004
    Do you share that view?
  • LDA Leadership in East London (Supplementary) [2]

    • Question by: Roger Evans
    • Meeting date: 17 March 2004
    Recently I paid a visit to one of your flagship projects, the Centre of Excellence for Manufacturing and Engineering (CEME), which is just inside my own constituency in Havering. I was impressed with the building, which is quite a smart piece of architecture, but there were a lot of problems with the running of the building, rather like any new building these days it would seem. When I went the heating was not working; there was a lot of space that was under-utilised. What is being done to actually make that place work properly, and to get more involvement from...
  • LDA Leadership in East London (Supplementary) [9]

    • Question by: Roger Evans
    • Meeting date: 17 March 2004
    Something else that I was concerned about when I visited was the condition of a lot of the equipment that is used for training there. I was told by one of the managers there that one of their visitors had recognised some of the machinery as what he used to use at Ford before he retired. Now, clearly that is not what we should be expecting from a centre of excellence. Will that be something that will be addressed sooner rather than later?
  • Infrastructure in the Thames Gateway (Supplementary) [3]

    • Question by: Bob Neill
    • Meeting date: 17 March 2004
    To save time here, I would be grateful if we could be sent that costing assessment, and if you also have any assessment of the costing, as you rightly say, of the social and health infrastructure, that would be helpful
  • Infrastructure in the Thames Gateway (Supplementary) [4]

    • Question by: Roger Evans
    • Meeting date: 17 March 2004
  • Infrastructure in the Thames Gateway (Supplementary) [5]

    • Question by: Bob Neill
    • Meeting date: 17 March 2004
    That would be helpful for the Assembly to have. The final question I wanted to ask was this: given that much of the infrastructure and demands do not stop at the Greater London boundary, what joint work has been done with, for example, Essex and Kent County Councils and the surrounding regions to see (a) what can be done to make sure that the infrastructure provision is properly aligned and (b) what economies of scale and what joint lobbying work can be done to advance the Gateway issue?
  • Infrastructure in the Thames Gateway (Supplementary) [6]

    • Question by: Bob Neill
    • Meeting date: 17 March 2004
    It would be very helpful to have the costings as far as they go on infrastructure issues. How advanced are we in terms of who is going to pay for all of this?
  • Infrastructure in the Thames Gateway (Supplementary) [8]

    • Question by: Roger Evans
    • Meeting date: 17 March 2004
    Chair, I will not raise it again, because we have dealt with it. Thank you for the comprehensive response, which covered most of the issues that I wanted to raise. On the subject of waste disposal, obviously that is going to have implications for the waste authorities and for the local authorities there. What is being done to work with them and to deal with that issue?
  • Regeneration/Environment

    • Reference: 2003/0303
    • Question by: Eric Ollerenshaw
    • Meeting date: 15 October 2003
    How much LDA money that had been earmarked for other projects has been set aside for the Olympic project? What will happen to these projects as a result? .